As Michael mentioned last week the only remaining demolition we had left to do was removing the dry wall from the interior wall on the second floor that faces the street. This wall is where we are reconfiguring the rough opening to install one of two sets of matching casement windows on the first and second floors while closing up an existing window opening on the second floor.
.
Comments