I gotta say the details and the materials were starting to get the better of me. It's Tuesday night and that means schedule check-in, but tonight I wanted to give it a kick. We did a cleaning reset on the last unfinished room (dining) and made it less of a materials storage area and the beginnings of another finished space.
On the plan we're doing ok at best. Last week I mentioned that it sometimes takes longer to set-up and strike a job than it takes to do it. This week I am finding the plus side of that equation is that there are limitless jobs to choose from. Nothing really has priority over another at this point; if you're tired of painting trim, miter and nail up some cedar for a while. Not working for you? How bout a bit of electrical fixture installation?
We've got a couple of big jobs queued up for each of the next three weekends (kitchen cabinets and trim, stairs installation, and sliding bathroom barn door respectively), if successful by December 1 you will see a blue sheet of perfection (at least I'm allowed to dream).
I'm waitin' for that bathroom door ---
Posted by: Ivy | 2007.11.06 at 20:01